CarpetworksUK Ltd were asked to source quality contract carpet tiles and vinyl wood plank for this very different installation. We recommended Forbo Outline & Flotex American Wood carpet tiles for the office areas and Forbo Allura vinyl wood plank for the feature walls.



Ross Hall

Ross Hall

Ross Hall, slideshow



Ross Hall
 

<< Go Back

Ross Hall - A new job

Ross Hall

As approved flooring contractor for BMI, CarpetworksUK Ltd were asked to replace the worn carpet barrier mat to the main entrance of Ross Hall Hospital, Glasgow with a new sturdy aluminium mat.


Gradus Esplanade 12mm aluminium closed construction matting in “Jackdaw Black” was chosen as the new primary mat with Gradus Boulevard matting in “Jackdaw Black” as secondary matting installed carrying on into main reception.


A 10pm start - with a completion deadline of 7am - first we had to remove the old matting and then apply a latex screed to smooth floors for both mats. Arditex NA screed was used for this because of its high strength and fast drying capabilities.


As there was no existing well to take new matting, we had to cut and fix a new 12mm ramped edge trim at main entrance and raise Boulevard mat secondary mat by fixing Gradus BU800 diminishing strip underneath to then butt against Esplanade mat to obtain the correct levels and remove any tripping hazards.


Gradus ramp edge trim was also fixed down both sides of Esplanade matting and Gradus TT35/AFT base plate and clip-top trims were cut, mitred and fixed around and between Boulevard matting and existing reception carpet.


As you can see, a lot of detail and materials were used in this small operation.


On completion, a quick hoover and tidy up and then exited building at 4.30am - another quality job delivered on time.